Quote requests for Scaffolding in Leeds

(1)
  • Scaffolding, Leeds

    Closed Ian Hanlon | Verified Request | 4 Question(s) | 0 Offer(s) | Thursday 4 April 2024

    We require the following scaffolding:- 1. Access tower/stairway from the external courtyard at the back of the building over the existing gas bottle store onto the 1st floor roof. 2. Access tower from the 1st floor roof up the building to the 6th floor, over the parapet onto the roof, approximately 20m high. Please also include for a ginny wheel for hauling of materials from the first floor to roof. 3. Access scaffold to 6th floor roof to enable construction of 5m high extract. We currently estimate the time periods for these works as follows:- Item 1 will be required for a period of 10 weeks Item 2 will be required for 6 weeks Item 3 will be required for one week.Read more