.

Closed Concrete Pumping

David Rowe

posted on Thursday 27 June 2019

expired on Thursday 11 July 2019

BA6 9LU, Glastonbury, Somerset
4.5 CM of concrete suitable for footings, will require pumping about 18 meters (I will confirm the exact requirement when excavations and planning are happy) The footings are at the back of the property via a standard size single gate, the drive which is quite wide slopes up from the road, the 18 meters of pipe required is from part way up the drive, if pumping is to be carried out from the road the length of pipe would need to be about 25 meters.

Public Chat

No questions

Received Offers (2)