Closed Excavation

Shane Davies

posted on Saturday 1 September 2018

expired on Monday 17 September 2018

SA16 0FZ, Burry Port, Carmarthenshire
Hi We are doing a garage conversion and im currently about half way through digging 2 trenches, one for the water feed and one for the soil pipe. They are roughly 10 metres each and join towards the end. We have all building regs etc in place. The digging is getting overwhelming now so I'm considering getting someone in to finish off. The water pipe trench is at 30 cm but needs to go to the correct level of 75cm. The one end of the soil pipe is at the mains sewer level and the rest is started and at a minimum level of around 30cm. I'm probably thinking one day with the digger would be enough. Thanks