Closed Solar or electrical expert

Mr Thomas Bache

posted on Saturday 19 July 2025

expired on Saturday 2 August 2025

GU10 4SN, Wrecclesham, Surrey
I need to obtain a DNO certificate for my solar. I dont have an MCS but Octopus allow export now without this. I need help with the following: Please see the requirements below: • ENA Application – Please complete the G99 A1-1 ENA application attached. • Site Map – An aerial view map showing the site boundary, the proposed/existing meter point • SLD – showing the number of generation sets and size to match the ENA with a clear demarcation between the DNO and customer equipment and the generation itself and labelling any G99 relay protection being used.

Public Chat

No questions

Received Offers

No offers