.

Closed Scaffolding

Ian Hanlon

posted on Thursday 21 March 2024

expired on Thursday 4 April 2024

LS2 9JT, Leeds, West Yorkshire
We require the following scaffolding:- 1. Access tower/stairway from the external courtyard at the back of the building over the existing gas bottle store onto the 1st floor roof. 2. Access tower from the 1st floor roof up the building to the 6th floor, over the parapet onto the roof, approximately 20m high. Please also include for a ginny wheel for hauling of materials from the first floor to roof. 3. Access scaffold to 6th floor roof to enable construction of 5m high extract. We currently estimate the time periods for these works as follows:- Item 1 will be required for a period of 10 weeks Item 2 will be required for 6 weeks Item 3 will be required for one week.

Public Chat

  • Elite Scaffolding Yorkshire Ltd
    Elite Scaffolding Yorkshire Ltd, posted on Thursday 21 March 2024 Is there any pictures/ drawings for the location of the scaffolding? Or site address so a visit or google search can be done. Thanks
    Ian Hanlon, posted on Thursday 21 March 2024 I have responded with an email to [email protected]
    Elite Scaffolding Yorkshire Ltd
    Elite Scaffolding Yorkshire Ltd, posted on Thursday 21 March 2024 Hi thanks for all the pictures , just one more question will the access tower (item2) be a staircase or laddered access?
    Ian Hanlon, posted on Thursday 21 March 2024 Hi, For the short time the scaffold is planned to be in place a laddered access should be sufficient.

Received Offers

No offers